Hill Dickinson Stadium – Everton FC

Hill Dickinson Stadium Case Study

Gas Safety & Control Systems

The Background

Products Supplied

We provided 6 x Merlin 1200S gas interlock systems for the commercial kitchens and a comprehensive gas safety system for the stadium’s boiler room, designed to monitor gas leaks and carbon monoxide levels.

Installation Details

The Merlin 1200S systems ensure safe gas operation by automatically shutting off the supply if ventilation levels fall below standards. Additionally, the boiler room was equipped with advanced leak detection and CO monitoring systems to safeguard the entire gas supply network.

Outcome

The installation enhances safety across the stadium, demonstrating a commitment to preventing gas hazards and ensuring a secure environment for staff and visitors.